|
| ridership2 = 6.5 million per year | open = | lastextension = 27 February 2008 | operator = TBC | stock = Citadis 300 type 302 | linelength = | gauge = | aveinterstation = }} The C line of the Bordeaux tramway is operated by the Tram et Bus de la CUB, and connects Les Aubiers to Terres Neuves. Being connected to the line A and line B, it will link Gare de Bordeaux Saint-Jean to different communes of the CUB. == History == Much like Line B, Line C experienced technical problems with the ground-level power supply (APS) which delayed its opening. It was inaugurated on 24 April 2004. Line C was prolonged towards Grand Parc on 19 November 2007 pending completion of important work brought about by the replacement Cracovie bridge on the line in Médoc, then to the north terminus les Aubiers station on 27 February 2008 and also towards Terres Neuves (Bègles) 27 February 2008. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Bordeaux Tramway Line C」の詳細全文を読む スポンサード リンク
|